thankfully the cabinet installation started to improve as we got the hang (pardon the pun) of it. today we managed to get 3 wall cabinets hung, the dishwasher end panel mounted, and started some base cabinet installation. the kitchen is actually starting to take shape.
some prep work:
we also installed the run of light rail in the dry bar and our method has now been established. the dry bar waiting for final molding touches, doors, shelves (little things):
tomorrow we hope to close out the refrigerator side of the kitchen and then in a week and a half we'll tackle the oven side and curio cabinets. on thursday we head to san diego for a much needed break! we had hoped our foreman would take care of the final coat of trim paint in the laundry room, but again he was asleep on the job: